Overview

Planned beforethe walls close.

Organized electrical rough-in during residential new construction.

The best time to get electrical work right is before drywall goes up. Decisions made during framing and rough-in determine where every receptacle, switch and fixture ends up, and how easily the space can adapt later.

Amper Group provides electrical work for new construction and for remodeling projects of all sizes. We plan the layout with the owner and the project team, coordinate with the overall schedule, and finish with a clean integration into the completed space.

  • Early Planning
  • Lighting Layouts
  • Project Coordination
Request an estimate

Capabilities

What we planand build.

  • Early planning

    Electrical decisions made before walls are closed, when changes are simplest.

  • Project coordination

    Electrical work coordinated with builders, remodelers and other trades.

  • Receptacle & switch placement

    Devices placed around furniture, counters, doors and daily routines.

  • Lighting layouts

    Lighting planned for tasks, circulation and atmosphere across each space.

  • Dedicated circuits

    Circuits for kitchens, appliances, equipment and other higher-demand needs.

  • Future needs

    Capacity and pathways considered for what the space may need next.

  • Clean finishes

    Devices and fixtures integrated neatly into the finished walls and ceilings.

What to expect

From first callto final connection.

How a new construction & remodeling project typically moves forward.

  1. Step 1

    Plan review

    We review drawings, layouts and goals with you and the project team.

  2. Step 2

    Electrical layout

    Receptacles, switches, lighting and circuits are mapped to the space.

  3. Step 3

    Rough-in

    Wiring is installed and coordinated with the project schedule.

  4. Step 4

    Finish & connect

    Devices and fixtures are installed and the system is completed.

Questions

Frequently askedquestions.

Every property is different. If your question depends on your space, request an estimate and we'll follow up.

As early as possible. Involving the electrician during planning makes it easier to place receptacles, switches and lighting where they belong, and to account for any capacity the new layout requires.